Skip to main content Go to contact form

Confidential Client – Natural Gas Processing Plant

Location: Crockett, TX

Matrix PDM Engineering provided program management, balance-of-plant (BOP) engineering, process and systems integration, and procurement support for the construction of the facility.

The new facility involves the integration of a Thomas Russell cryogenic module, interstate treating amine and stabilizer process equipment, SEC compressors, and client-supplied equipment with the BOP equipment and piping.

100%
commitment to safety
0
incident safety culture

Scope of Work

  • Performed detailed processing and project engineering functions, including the integration of all process units, facility P&ID development, and procurement of balance of plant process equipment
  • Developed facility layout to define locations for all equipment and ancillary items
  • Performed detailed piping engineering and design for interconnecting process units
  • Performed engineering design and developed structural drawings for pipe racks and miscellaneous steel structures
  • Developed specifications for engineering equipment along with procurement of scrubbers, flare system, RTO, control system equipment, reverse osmosis water system, balance-of- plant instrumentation, and various storage tanks with pumps
  • Overall project management; on-site field design support for piping, electrical, and I&E; construction management; and loop checks

Put Our Standard
To The Test.

Get in touch with Matrix for your next project.
return to top icontop