Skip to main content Go to contact form
Cemex Packhouse Integration Fairborn Main Image

Cemex – Cement Facility Packhouse Integration – Fairborn, OH

Location: Fairborn, Ohio

This $12 million cement packhouse facility produces 50,000 tons of gray cement and 44,000 tons of colored cement per year with four 150 ton tanks for colored cement and a 200 ton tank for gray cement. Matrix PDM Engineering provided structural, electrical and mechanical design and construction phase services to help move the already manufactured cement to the packhouse for packing.

The cement facility needed an up-to-date packhouse to automatically pack the cement into bags and palletize. The new system includes a packing and palletizing rate of 1,800 bph. Matrix PDM also integrated the control systems and software and performed start-up and commissioning services.

$12MM
contract price
94k
total tons of cement produced per year
1800bph
packing and palletizing rate

Scope of Work

  • Design engineering
  • Construction
  • Integrated control systems and software for start-up and commissioning
  • Automating palletizing and shrink wrap system
  • Warehouse storage for bagged cement

Put Our Standard
To The Test.

Get in touch with Matrix for your next project.
return to top icontop