Skip to main content Go to contact form
Skematic drawing of facility

Client Confidential – Natural Gas Plant Truck Loading Facility

Location: Central, TX

Matrix PDM Engineering’s project team integrated controls and process systems to design a new truck loading facility in under four months, meeting the clients’ aggressive time-frame.

The new additions included two truck loading bays, two 90,000 gallon storage tanks, and enclosed flare for vapor incineration, slop tank, sump and pump and other ancillary equipment. The loadout was designed for bottom load trucks with the ability to add two more loading bays in the future.

100%
Commitment to safely meeting deadlines
2x 90000
gallon storage tanks
0
Incident safety culture

Scope of Work

  • Enclosed flare skid for vapor combustor
  • Truck loading canopy for operators
  • Two 90,000 gallon storage tanks
  • Concrete containment
  • Piping interconnecting the equipment modules

Put Our Standard
To The Test.

Get in touch with Matrix for your next project.

Bevan Houston
Phone: 918 281 6036
Email: bevanhouston@matrixpdm.com

Human Resources
Phone: 888 898 4473
Email: pgriggs@matrixpdm.com

Please select an option from the drop down to see the contact information.

return to top icontop